Sign In | Join Free | My udpf.com
China Qingdao Running Machine CO.,LTD logo
Qingdao Running Machine CO.,LTD
Quality first, Customers highest
Verified Supplier

6 Years

Home > Rubber Batch Off Machine >

High Efficiency Rubber Cooler Machine For Tire Tread Film Cooling Production Line

Qingdao Running Machine CO.,LTD
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment

High Efficiency Rubber Cooler Machine For Tire Tread Film Cooling Production Line

Brand Name : RUNNING

Model Number : width 600

Certification : CE,SGS

Place of Origin : CHINA

MOQ : 1

Price : Negotiable

Payment Terms : L/C, D/A, D/P, T/T

Supply Ability : 20SET/M

Delivery Time : 20DAYS

Packaging Details : FCL

motor power : 21KW

cooling type : water and fans

control type : PLC

Contact Now

Automatic Rubber Batch off Cooling machine Line for Tyre Rubber sheet

Basic introduction of rubber cooling line
Main function of the unit is to cool rubber strip coming either from two-roll mill or from roller-calender and stacking of cooled rubber sheet on platette.


Features of Rubber cooling line

Rubber sheet comes into the batch-off unit entry (dip tank/soaking bath), where separation solution is applied, then is cooled in cooling tunell, captured by gripping equipment and pulled on the feeding conveyor. Feeding conveyor moves cooled rubber sheet through cutting equipment onto stacking equipment. Cooled rubber sheet is put on palette in wig-wag stacking or by plates. When given weight or height of stacked rubber sheet is achieved, full palette is replaced by empty one.

Parameter of rubber batch off cooling machine

Parameter/model XPG-600 XPG-900
Speed (m/min) ~30 ~40
Sheet thickness (mm) 4-15 6-12
Sheet width (mm) 600 800
Max capacity (kg) 300 1500
Rubber hanging height (mm) 1400 1400
Distance between hanging rod (mm) 127 106
QTY of cooling fan 12 18
Cooling fan power (KW) 0.75 0.75
Cooling fan blowing capacity (m³/h) 5300 5300
Rubber sheet temperature (ºC) ≤40 ≤40
Total power (KW) 21 25
Weight (kg) 5500 7500

High Efficiency Rubber Cooler Machine For Tire Tread Film Cooling Production LineHigh Efficiency Rubber Cooler Machine For Tire Tread Film Cooling Production LineHigh Efficiency Rubber Cooler Machine For Tire Tread Film Cooling Production Line

Salient Features

  1. Electric heating system, even temperature spread along the roll
  2. Chrome plated surface, no split-off
  3. Adjustable gap, variable sampling thickness
  4. Revers jog rotating
  5. If dual inverter & motor is equipped, the two roll mill can has any speed ratio for different mixing purposes
  6. High precision PID temperature controller with PLC control
  7. Protection cover on roller top
  8. Emergency safety switch at knee level
  9. Emergence locking switch on control panel
  10. Touch screen graphic user interface
  11. Variable speed control with frequency inverter
  12. Optional the same speed of the two rolls
  13. Optional oil heating system



Services Commitment
1. Our engineers can design target machines for you and send the drawing to confirm.
2. In the process of production, we will take photos and send to customers for you tracking.
3. Documents such as packing list, commercial invoice, and bill of lading etc. will be sent after the delivery.
4. We could supply free English foundation DWG, installation drawing, user guide, maintenance manual and part drawing.
5. We supply overseas technical support
6.Test Machine Before Delivery, you only need to connect the wires to the outside the control cabinet.

FAQ
1. Delivery time of the rubber machines?
This is specially designed machine according to your specific requirement.
From engineer designing to production completion, it needs about 25 to 35 days.

2. What does your factory do regarding quality control?
We pay much more importance to quality control from the very beginning to the end of production.
Every machine will be fully assembled and carefully tested before shipment.

3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.

4. Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
Small machine usually takes within 2~3 days.
Big plant usually takes about 30 days.

5. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order.
The core of our company culture is innovation,quality,integrity and efficiency. Also we have had many good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us.

6. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao liuting airport.
We will pick up you at the airport.




Product Tags:

batch off cooling machine

      

batch off cooler

      
Best High Efficiency Rubber Cooler Machine For Tire Tread Film Cooling Production Line wholesale

High Efficiency Rubber Cooler Machine For Tire Tread Film Cooling Production Line Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Qingdao Running Machine CO.,LTD
*Subject:
*Message:
Characters Remaining: (0/3000)
 

Friendly Links: www.everychina.com

Home| Products| Suppliers| Quality Suppliers| Site Map |About Us |Contact Us |Help |关于我们 |联系我们

Copyright © 2009 - 2024 udpf.com. All rights reserved.